Heavy Industrial AK Steel Caster Emergency Repair > Projects > Vessel Outboard Bearing Replacement Emergency shutdown to perform repairs around the clock over a holiday weekend preventing excessive production downtime. Inside the Project 91Èȱ¬was called in on an emergency repair to replace a worn outboard shaft bearing on the Basic Oxygen Furnace. A temporary frame and jacking system was installed to raise the 1,000 ton furnace in order to replace the bearing. Why it matters Emergency maintenance of the basic oxygen furnace was required to prevent further damage of the adjacent Bull Gear that would have resulted in excessive production downtime. 91Èȱ¬performed the replacement around the clock over a two week period to get our client back to full production. PROJECT DETAILS: Project Name: Vessel Outboard Bearing Replacement IMG_5269 IMG_5329 Close IMG_5269 IMG_5329
Emergency shutdown to perform repairs around the clock over a holiday weekend preventing excessive production downtime. Inside the Project 91Èȱ¬was called in on an emergency repair to replace a worn outboard shaft bearing on the Basic Oxygen Furnace. A temporary frame and jacking system was installed to raise the 1,000 ton furnace in order to replace the bearing. Why it matters Emergency maintenance of the basic oxygen furnace was required to prevent further damage of the adjacent Bull Gear that would have resulted in excessive production downtime. 91Èȱ¬performed the replacement around the clock over a two week period to get our client back to full production. PROJECT DETAILS: Project Name: Vessel Outboard Bearing Replacement IMG_5269 IMG_5329 Close IMG_5269 IMG_5329